Asphalt surface renovation in Pils Street (from Lacplesa Street to Ausekla Street), Lielvarde town.

Construction time – from September 3rd to October 15th, 2015. The following major works have been accomplished:

  • asphalt surface milling,
  • installation of culverts (d=0.3m),
  • installation of culverts (d=0.5m),
  • installation of culverts (d=1m),
  • construction of a freeze-resistant layer,
  • construction of a non-mineral basic layer (15cm),
  • construction of hot asphalt AC-16 surf (6cm),
  • planting of greenery with soil (10cm),
  • paving.