Reconstruction of Laimdotas Street (Sipeles Street – Memeles Street) in Marupe Village

Construction time – from July 27 to November 15, 2016. The following major works have been accomplished:

  • the existing mineral material pavement demolition,
  • replacement of communications wells covers ,
  • construction of entrenchment,
  • planting of greenery,
  • construction of non-freezing layer ( h=30 cm),
  • basic layer construction from mineral materials (0/56),
  • basic layer construction from mineral materials (0/45),
  • construction of hot asphalt (AC 16 base, S IV, 5 cm),
  • construction of hot asphalt (AC 8 surf, S III, 3 cm),
  • construction of leveling layer from granite (h=approx.3cm),
  • paving.